Project Highlights:
Brymark was awarded the fabrication and installation contract of 5 distribution modules for a dust suppression system. The enclosed modules were fabricated from modified shipping containers in which all structural mechanical and electrical fabrication was completed in our Port Coquitlam shop. The completed modules were trucked to site and installed upon completion of footings. The modules control water distribution for a site-wide dust suppression system.