NEW AFTON MINE’S CENTRAL VALVE STATION PROJECT 

 

Location:

Kamloops, B.C.

 

Client:

New Gold

 

Completion Date:

October 2021

 

Brymark Installations Group was awarded the contract to construct and install New Gold’s Central Valve Station located at the Crest of the New Afton Tailing Storage Facility (NATSF).

Brymark’s scope of work included:

  • Receipt of Owner supplied piping and valves.
  • Construction of a Central Valve Station consisting of 2 modular units including structural steel and coating
  • Pipe fabrications and coating, shop assembly and preparations for transportation.
  • Transportation and installation of the CVS at the New Afton Mine site, commissioning, and start-up.