BC HYDRO – LADORE, STRATHCONA

 

Location:

Campbell River, B.C.

 

Client:

BC Hydro

 

Consultant:

Allnorth Consulting – Brymark

 

Start Date:

April 2015 (Ladore)

December 2015 (Strathcona)

 

Completion Date:

August 2015 (Ladore)

October 2016 (Strathcona)

 

Brymark’s scope of work included:

  • Early 2015 Brymark was awarded the Ladore Intake gate replacement and supporting mechanical system design-build contract Our team swapped out the old intake gates, installed new electric controls, rebuilt hoist mechanisms, installed a new building enclosure, and commissioned the new system. 
  • Late 2015 Brymark was awarded the Strathcona Intake gate replacement design-build contract. Our team, designed & engineered, refurbished the existing stop logs, swapped out the existing gates, installed new hoist cables, cleared debris from the trash racks with diver support working at depths of 100 ft & commissioned the new system.
  • Both projects were delivered with Zero Safety and Environmental incidents.